Commercial · B2B

Commercial solar for offices, showrooms and industry in Kochi & Ernakulam

Offices, showrooms, workshops and industrial roofs across Kochi and Ernakulam, sized against your daytime load curve.

Free site survey · written proposal in 24 hours

At a glance

Scheme
KSEB net metering

Sizing basis
Daytime load curve

Connection
Three-phase from ~6 kW

Proposal
Written, within 24 hours

The commercial case

Does commercial solar make sense for a business in Kochi?

Often better than for a home, because a business consumes most of its electricity during the hours the roof generates. A unit consumed on site as it is produced offsets electricity you would otherwise buy outright, which is worth more than an exported unit earning net-metering credit. What a commercial connection cannot claim is the PM Surya Ghar subsidy. That scheme is residential only.

Solar panels on a home exporting surplus power to the KSEB grid
01

Daytime load is the advantage

Offices, showrooms and workshops draw power between roughly 9 am and 6 pm, which is exactly when the roof produces.

02

No PM Surya Ghar on commercial connections

It is a residential scheme. Commercial premises still use KSEB net metering.

03

Three-phase and connection capacity

Systems from around 6 kW upwards generally need a three-phase connection. Sanctioned load and connection type have to be established before design.

04

Usable roof needs measuring

Commercial roofs carry plant, ducting, tanks and walkways. Usable area is almost always less than the building footprint suggests.

What we establish on site

The four things a commercial survey settles

Roof

Usable shade-free area

Measured, not estimated

Obstructions

Plant, ducting, tanks, walkways

Structure

Load-bearing check
Electrical

Connection

Single or three-phase

Sanctioned load

Against proposed capacity

Metering

KSEB net metering

Sizing a commercial system follows the daytime load curve rather than the annual unit total. That is a different calculation from a house, and getting it wrong in either direction is expensive.

A unit consumed on site as it is generated is worth more than a unit exported.

What we provide

Solar solutions, end to end

Every system is designed around your own roof and your own electricity use, for homes and for businesses. Tell us which of these fits and we will survey the site free of charge.

Residential Solar

For homes

✓  Rooftop solar for homes

✓  System design based on your electricity usage and roof conditions

✓  KSEB and net-metering guidance

✓  Subsidy assistance where applicable

✓  Installation and commissioning

✓  Ongoing support

Commercial Solar

For businesses

✓  Rooftop solar for businesses

✓  System design based on your load and roof conditions

✓  Energy-use assessment

✓  Installation and commissioning

✓  KSEB and grid coordination

✓  Ongoing support

Solar System Options

Choose the configuration that fits the site

Trusted brands. Krafted for you.

Emmvee solar panel manufacturer logoAdani Solar manufacturer logoABB electrical equipment logoFoxESS solar inverter manufacturer logoGoldi Solar panel manufacturer logoWaaree Energies solar panel manufacturer logoReNew renewable energy company logoL&T electrical products logoSchneider Electric logoMersen electrical protection logoRayzon Solar panel manufacturer logoHavells electrical products logo

Questions

Commercial solar, answered

PM Surya Ghar is a residential rooftop scheme, so a commercial connection is not eligible. KSEB net metering is available to commercial connections.

It follows the daytime load curve rather than the annual total. The design question is how much of your consumption during generating hours the roof can cover, which needs your load pattern, not just your bill total.

Generally for systems from around 6 kW upwards. Most commercial premises already have three-phase; if not, that conversion needs establishing before design.

It needs the building owner's consent, since the array is fixed to their roof and the net-metering agreement attaches to the connection. Worth resolving before a survey.

Next step

Request a written proposal.

A site survey, a load review and a written proposal within 24 hours.