KSEB net metering
KSEB net metering for rooftop solar in Kerala
Net metering is what turns a Kerala roof into a year-round system: credit banked in the strong months carries the monsoon.
A bi-directional meter records both the electricity you draw from the grid and the surplus your roof exports to it. Your bill is settled on the net position, so units exported on a bright February afternoon offset units drawn on a wet July evening.…
How it works
Net metering, in plain terms
A bi-directional meter is required
KSEB installs it. It replaces or supplements your existing meter and records flow in both directions.
Settlement is on the net position
You are billed on the difference between what you drew and what you exported over the billing period.
Feasibility approval comes first
KSEB assesses whether your connection and the local network can take the proposed capacity.
It does not give you backup
Net metering is a billing arrangement, not storage. A grid-tied system still stops producing during an outage. If you need power during a cut, that is a hybrid system.
The process
Five steps to a net meter
Feasibility application
Submitted to your section office with the proposed capacity.
Approval
KSEB confirms the connection can take the system.
Installation and testing
The system is installed and tested.
Net meter installation
KSEB replaces your meter with a bi-directional net meter.
Agreement and commissioning
The net-metering agreement is signed and the system goes live.
Reading the bill
What changes on your KSEB bill
Net metering is the reason the monsoon does not break the arithmetic. Without it, surplus generation in the strong months would simply be lost.
The bill starts showing units imported and units exported separately, with the difference carried as credit. In the strong months you bank credit; in the monsoon you draw it down. The annual figure is what matters, not any single month.
Trusted brands. Krafted for you.












Official sources
Net-metering terms in Kerala are set by KSEB under the regulations of the State Electricity Regulatory Commission. Both are linked here so you can check the current position yourself.
Kerala State Electricity Regulatory Commission: erckerala.org
SunKraft Solar is not affiliated with any of these bodies. The links are provided so you can verify the scheme and tariff facts stated on this page.
Questions
Net metering, answered
A meter that records electricity flowing in both directions, what you import from KSEB and what your roof exports to it, so the bill can be settled on the net position.
It means exported units are credited against imported units. The commercial terms and any settlement of unused credit are set by the applicable KSERC regulations and KSEB's procedures.
The scheme is built around grid-connected residential rooftop systems, and KSEB feasibility approval and net metering are part of that process.
No. It is a billing arrangement. A grid-tied inverter shuts down when the grid fails, for safety. Backup during outages requires a hybrid system with a battery.
Next step
We handle the KSEB paperwork.
Feasibility, the agreement and the net-meter coordination.