Applying locally

PM Surya Ghar subsidy in Kochi & Ernakulam

The scheme is central, but the feasibility approval and the net meter come from your own KSEB section office.

Free site survey · written proposal in 24 hours

Locally

How do I claim the PM Surya Ghar subsidy in Kochi or Ernakulam?

You register on the Government of India National Portal, your DISCOM, KSEB in Kerala, issues a feasibility approval, the system is installed by a registered vendor, KSEB installs a bi-directional net meter and inspects the installation, and the subsidy is then credited to your bank account. SunKraft handles the portal registration, the KSEB feasibility application and the net-metering agreement as part of the project.

In Kerala the step that sets the timeline is the KSEB feasibility approval, not the installation. Knowing that in advance is the difference between a realistic commissioning date and an optimistic one.

In Ernakulam

What is local about a central scheme

01

Your KSEB consumer number

Registration on the National Portal is against the consumer of record.

02

Your section office

Feasibility is assessed by the section office that serves your address.

03

Survey and proposal

We measure the roof and confirm the capacity the subsidy will apply to.

04

Installation and net meter

Commissioning, then the KSEB net meter and inspection.

05

Claim and disbursal

Submitted through the portal and followed through to your bank account.

Questions

Applying here, answered

KSEB is the DISCOM

Every net-metering and subsidy application in Ernakulam district goes through KSEB.

Zero advance until approval

Our first payment falls due once that feasibility approval is in place, not before.

Residential connections only

A commercial connection in Kochi cannot claim it, though net metering still applies.

Feasibility approval comes first

Nothing should be installed before KSEB has confirmed feasibility for your connection.

The amount is national, not local

₹30,000 per kW for the first 2 kW, ₹18,000 for the third, capped at ₹78,000. It does not vary by district.

Trusted brands. Krafted for you.

Emmvee solar panel manufacturer logoAdani Solar manufacturer logoABB electrical equipment logoFoxESS solar inverter manufacturer logoGoldi Solar panel manufacturer logoWaaree Energies solar panel manufacturer logoReNew renewable energy company logoL&T electrical products logoSchneider Electric logoMersen electrical protection logoRayzon Solar panel manufacturer logoHavells electrical products logo

Official sources

Registration for the scheme happens on the national portal; feasibility and the net meter come from your own KSEB section office. Both are linked here.

PM Surya Ghar National Portal: pmsuryaghar.gov.in

SunKraft Solar is not affiliated with any of these bodies. The links are provided so you can verify the scheme and tariff facts stated on this page.

Questions

Subsidy in Kochi, answered

No. PM Surya Ghar is a national scheme with the same amounts everywhere: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third, capped at ₹78,000. What is local is the DISCOM handling it, which in Kerala is KSEB.

It varies by connection and by load, and it is the step that usually sets the overall timeline. We file the application and follow it up rather than leaving you to chase it.

Not for the parts we handle. We register you on the National Portal, file the feasibility application and handle the net-metering agreement.

That is not how the scheme is designed to work. Feasibility approval should be in place before installation, and the subsidy follows commissioning and inspection.